EnviroBlend® managed the construction activities at East Penn Manufacturing, including excavation, stabilization, placement, and structural compaction of over 30,000 tons of lead-contaminated soil and battery casings at an acid battery manufacturing plant. EnviroBlend also managed the remedial closure of two solid waste units, placing stabilized soil and battery casings into the former ore pit and structurally compacting the material to accommodate future upgrades to the facility. This saved the expense and liability of disposing of these materials off-site.